Vertical vacuum furnace for marine diesel engine parts
Marine engine manufacturer
Heating zone φ1500×3000 mm, 3.2 t per charge, crankshafts and liners processed in one load, 6,200 operating hours a year.
CustomerMarine engine manufacturer
IndustryMarine
Location辽宁 大连
Delivered28 October 2025

Background and process solution
Marine parts exceed 2.5 m in length; horizontal furnaces are hard to load and gravity causes distortion.
The JVGQV-1500 vertical furnace loads from the top with an electric hoist; three independently controlled heating zones keep ±5 ℃ uniformity even at a 2:1 aspect ratio.
The shell and vacuum set are designed for 6,200 hours a year, with turbomolecular pumps, on-line leak testing and a 2,000-hour maintenance interval.
Results
3.2 t per charge, loading time cut from 4 hours to 50 minutes, unplanned downtime under 24 hours a year.